Cleanup work continues on day two, focusing on removing tree tops and stumps for excavation. The team faces challenges with brush cleaning, prompting a reconsideration of chipping. They clear a path for firewood and use effective fire starters. Favorable weather aids their efforts, and a skid steer with a root grapple improves efficiency. Future plans include stump removal, driveway installation, and a septic test to establish a home site.
Up Next in Season 1
-
S1E8 Navigating Septic System Challenges
The septic system faces significant challenges due to a failed test and an unsuitable site, leaving the property in jeopardy. The process includes conducting a perk test to analyze soil layers, but large rocks complicate excavation efforts. Plans are underway to explore additional land for potent...
-
S1E9 Septic System Update: New Sites ...
The septic system update reveals the failure of the first probe test and the approval of two new sites. Preparation for the PERC test includes clearing trees and rocks and digging holes. Plans for well installation are in motion, with contractor meetings and a received permit. Electric service in...
-
S1E10 Progress Update on Erosion Cont...
Dirt moving is nearly finished, emphasizing erosion control. Grass seed is applied ahead of rain, while rock picking is a major focus, ensuring back safety. Wildlife, especially deer, is present. Seeding faces challenges from rain and hot, humid conditions. After two to three weeks, seed germinat...