The excavation project kicks off with electric service setup, utilizing favorable weather and borrowed equipment. The team begins digging for the transformer pad and trenching, following a diagram from the electric company. Hydraulic issues with the excavator cause delays, but the team pushes on with pipe installation, tackling glue challenges and weather setbacks. Manual backfilling occurs due to equipment problems, while maintaining a clean work area. Future plans and assistance are discussed to keep viewers engaged.
Up Next in Season 1
-
S1E21 Elaina Operates the Mini Excavator
Elaina hops on the mini excavator and undergoes training focused on construction skills, emphasizing safety and control mechanisms. The training includes practical operation, where the trainee learns to lift and move dirt, building confidence in their abilities. After the experience, the trainee ...
-
S1E22 Building Footing Forms and Batt...
The project kicks off with enthusiasm but faces challenges from rain affecting construction. A swimming pool is found, leading to necessary adjustments. After cleaning the trench, water and electric line sleeves are installed, and footing forms are set up with horizontal and vertical rebar for su...
-
S1E23 Pouring Concrete Footings
Water management presents challenges during construction as significant accumulation occurs in the footing despite tarp efforts. Preparations for the concrete pour involve scheduling the truck and confirming neighbor assistance. Rebar installation emphasizes safety with caps and wire chairs. The ...